Clyde Quay Wharf


Architect

Athfield Architects


Contractor

LT McGuiness


Problem

Supply a height safety system to compliment the marine aesthetic and exposed, corrosive environment,


Solution

Securpin Anchors on the main roof area were electropolished to prevent tea staining of stainless steel, and were located off-grid to structure to position the anchor points mid-pan in Eurotray roofing. Extensive as-built design documentation was provided


Products

Roofsafe Cable/Spirotech Anchor to flat membrane roof area, L4543 and L4544 Anchor Points, Skylotec Mobifix Anchors to balcony floors, Skylotec Securpin to main aluminium roof area.

PBI were invited to design and build a complete fall arrest solution for all roof areas including the main roof, feature roofs requiring abseil access and balconies. Installing through various roofing materials on NZ’s largest private development underway at the time. The building is Supreme Award winner of the 2015 New Zealand Commercial Project Awards.

Problem

Supply a height safety system to compliment the marine aesthetic and exposed, corrosive environment,

Solution

Securpin Anchors on the main roof area were electropolished to prevent tea staining of stainless steel, and were located off-grid to structure to position the anchor points mid-pan in Eurotray roofing. Extensive as-built design documentation was provided